Production Engineering
Metrology and Inspection
Marks 1Marks 2
Sheet Metal Forming Processes
Marks 1Marks 2
Welding Process
Marks 1Marks 2Marks 5
Advance Machine Tools
Marks 1Marks 2
1
GATE ME 2015 Set 3
Numerical
+2
-0
Ratio of solidification time of a cylindrical casting (height $$=$$ radius) to that of a cubic casting of side two times the height of cylindrical casting is ____________
Your input ____
2
GATE ME 2015 Set 3
Numerical
+2
-0
The dimensions of a cylindrical side riser (height $$=$$ diameter) for a
$$25cm \times 15cm \times 5cm$$ steel casting are to be determined. For the tabulated shape factor values given below, the diameter of the riser (in $$cm$$) is _______________ GATE ME 2015 Set 3 Production Engineering - Casting Question 25 English
Your input ____
3
GATE ME 2014 Set 1
Numerical
+2
-0
An aluminium alloy (density $$2600$$ $$kg/{m^3}$$ ) casting is to be produced. A cylindrical hole of $$100$$ $$mm$$ diameter and $$100$$ $$mm$$ length is made in the casting using sand core (density $$1600$$ $$kg/{m^3}$$ ). The net buoyancy force (in Newton) acting on the core is _____________________
Your input ____
4
GATE ME 2014 Set 4
Numerical
+2
-0
A cylindrical riser of $$6$$ $$cm$$ diameter and $$6$$ $$cm$$ height has to be designed for a sand casting mould for producing a steel rectangular plate casting of $$7cm \times 10cm \times 2cm$$ dimensions having the total solidification time of $$1.36$$ minute. The total solidification time (in minute) of the riser is ___________________
Your input ____
GATE ME Subjects
Engineering Mechanics
Machine Design
Strength of Materials
Heat Transfer
Production Engineering
Industrial Engineering
Turbo Machinery
Theory of Machines
Engineering Mathematics
Fluid Mechanics
Thermodynamics
General Aptitude