GATE ME 2005
MCQ (Single Correct Answer)
+2
-0.6
Match List - $${\rm I}$$ (products) with List - $${\rm II}$$ (casting process) and select the correct answer using the codes given below the lists GATE ME 2005 Production Engineering - Casting Question 11 English
A
$$A - 3,\,\,B - 2,\,\,C - 4,\,\,D - 5$$
B
$$A - 1,\,\,B - 3,\,\,C - 4,\,\,D - 5$$
C
$$A - 1,\,\,B - 2,\,\,C - 3,\,\,D - 4$$
D
$$A - 3,\,\,B - 2,\,\,C - 5,\,\,D - 4$$
2
GATE ME 2005
MCQ (Single Correct Answer)
+2
-0.6
A mould has a downsprue whose length is $$20$$ $$cm$$ and the cross sectional area at the base of the down sprue is $$1\,\,c{m^2}.$$ The down sprue feeds a horizontal runner leading into the mould cavity of volume $$1000\,\,c{m^3}.$$ The time required to fill the mould cavity will be
A
$$4.05$$ s
B
$$5.05$$ s
C
$$6.05$$ s
D
$$7.25$$ s
3
GATE ME 2004
MCQ (Single Correct Answer)
+2
-0.6
Gray cast iron blocks $$200 \times 100 \times 10\,\,mm$$ are to be cast in sand moulds. Shrinkage allowance for pattern making is $$1$$%. The ratio of the volume of pattern to that of the casting will be
A
$$0.97$$
B
$$0.99$$
C
$$1.01$$
D
$$1.03$$
4
GATE ME 2003
MCQ (Single Correct Answer)
+2
-0.6
With a solidification factor of $$0.97 \times {10^6}s/{m^2},$$ the solidification time (in seconds) for a spherical casting of $$200$$ $$mm$$ diameter is
A
$$539$$
B
$$1078$$
C
$$4311$$
D
None
GATE ME Subjects
Engineering Mechanics
Machine Design
Strength of Materials
Heat Transfer
Production Engineering
Industrial Engineering
Turbo Machinery
Theory of Machines
Engineering Mathematics
Fluid Mechanics
Thermodynamics
General Aptitude