Line Balancing
Practice Questions
Marks 2
1
The table gives details of an assembly line. GATE ME 2006 Industrial Engineering - Line Balancing Question 1 English

What is the line efficiency of the assembly line?

GATE ME 2006
2
An electronic equipment manufacturer has decided to add a component sub-assembly operation that can produce $$80$$ units during a regular $$8$$-hour shift. This operation consists of three activities as below . GATE ME 2004 Industrial Engineering - Line Balancing Question 2 English

For line balancing the number of work stations required for the activities $$M, E$$ and $$T$$ would respectively be

GATE ME 2004
3
In an assembly line for assembling toys, five workers are assigned tasks which take times of $$10, 8, 6, 9$$ and $$10$$ minutes respectively. The balance delay for the line is
GATE ME 1996