Industrial Engineering
Line Balancing
Marks 21
GATE ME 2014
MCQ (Single Correct Answer)
+1
-0.3
The total number of decision variables in the objective function of an assignment problem of size $$n\,\, \times \,\,n$$ ($$n$$ jobs and $$n$$ machines) is
Questions Asked from Marks 1
GATE ME Subjects
Engineering Mechanics
Machine Design
Strength of Materials
Heat Transfer
Production Engineering
Industrial Engineering
Turbo Machinery
Theory of Machines
Engineering Mathematics
Fluid Mechanics
Thermodynamics
General Aptitude