Industrial Engineering
Line Balancing
Marks 21
GATE ME 2023
MCQ (Single Correct Answer)
+1
-0.33
Which one of the options given represents the feasible region of the linear programming model:
𝑀𝑎𝑥𝑖𝑚𝑖𝑧𝑒 45𝑋1 + 60𝑋2
𝑋1 ≤ 45
𝑋2 ≤ 50
10𝑋1 + 10𝑋2 ≥ 600
25𝑋1 + 5𝑋2 ≤ 750

2
GATE ME 2022 Set 1
MCQ (Single Correct Answer)
+1
-0.33
In a linear programming problem, if a resource is not fully utilized, the shadow price of that resource is
3
GATE ME 2010
MCQ (Single Correct Answer)
+1
-0.3
Simplex method of solving linear programming problem uses
4
GATE ME 1996
MCQ (Single Correct Answer)
+1
-0.3
If at the optimum in a linear programming problem, a dual variable corresponding to a particular primal constraint is zero, then it means that
Questions Asked from Marks 1
GATE ME Subjects
Engineering Mechanics
Machine Design
Strength of Materials
Heat Transfer
Production Engineering
Industrial Engineering
Turbo Machinery
Theory of Machines
Engineering Mathematics
Fluid Mechanics
Thermodynamics
General Aptitude