Production Engineering
Metrology and Inspection
Marks 1Marks 2
Sheet Metal Forming Processes
Marks 1Marks 2
Welding Process
Marks 1Marks 2Marks 5
Advance Machine Tools
Marks 1Marks 2
1
GATE ME 1990
MCQ (Single Correct Answer)
+1
-0.3
Most of the metal cutting heat goes into the
A
Moving chip
B
cutting tool
C
Work material
D
machine tool
2
GATE ME 1989
MCQ (Single Correct Answer)
+1
-0.3
The size of $$BLUE$$ in metal cutting increases with
A
very high speed
B
large uncut chip thickness
C
use of cutting fluid
D
increase in positive rake angle
3
GATE ME 1989
MCQ (Single Correct Answer)
+1
-0.3
Crater wear always starts at some distance from the tool tip because at that point
A
cutting fluid does not penetrate
B
chip tool interface temp is maximum
C
normal stress on rake face is maximum
D
tool strength is minimu8m
4
GATE ME 1988
MCQ (Single Correct Answer)
+1
-0.3
The ideal cutting fluid for low speed machining of metals should be one which
A
removes the heat faster from the cutting zone,
B
forms a coating on the cutting tool by chemical reaction
C
forms a low shear strength film of work material at the tool chip interface
D
serves as a dielectric minimizing thereby reactions due to $$EMF$$ at the interface
GATE ME Subjects
Engineering Mechanics
Machine Design
Strength of Materials
Heat Transfer
Production Engineering
Industrial Engineering
Turbo Machinery
Theory of Machines
Engineering Mathematics
Fluid Mechanics
Thermodynamics
General Aptitude