Production Engineering
Metrology and Inspection
Marks 1Marks 2
Sheet Metal Forming Processes
Marks 1Marks 2
Welding Process
Marks 1Marks 2Marks 5
Advance Machine Tools
Marks 1Marks 2
1
GATE ME 2003
MCQ (Single Correct Answer)
+2
-0.6
Match the following GATE ME 2003 Production Engineering - Welding Process Question 34 English
A
$$P - 2,\,\,Q - 5,\,\,R - 1,\,\,S - 3$$
B
$$P - 6,\,\,Q - 3,\,\,R - 4,\,\,S - 4$$
C
$$P - 4,\,\,Q - 1,\,\,R - 6,\,\,S - 2$$
D
$$P - 5,\,\,Q - 4,\,\,R - 2,\,\,S - 6$$
2
GATE ME 2001
MCQ (Single Correct Answer)
+2
-0.6
resistance spot welding is performed on two plates of $$1.5$$ $$mm$$ thickness with $$6$$ $$mm$$ diameter electrode, using $$15000$$ $$A$$ current for a time duration of $$0.25sec$$. assuming the interface resistance to be $$0.0001\Omega ,$$ the heat generated to form the weld is
A
$$5625$$ $$W$$-$$sec$$
B
$$8437$$ $$W$$-$$sec$$
C
$$22500$$ $$W$$-$$sec$$
D
$$33750$$ $$W$$-$$sec$$
3
GATE ME 1996
Subjective
+2
-0
GATE ME 1996 Production Engineering - Welding Process Question 36 English
4
GATE ME 1991
Subjective
+2
-0
GATE ME 1991 Production Engineering - Welding Process Question 37 English
GATE ME Subjects
Engineering Mechanics
Machine Design
Strength of Materials
Heat Transfer
Production Engineering
Industrial Engineering
Turbo Machinery
Theory of Machines
Engineering Mathematics
Fluid Mechanics
Thermodynamics
General Aptitude