1
GATE ME 2002
MCQ (Single Correct Answer)
+1
-0.3
A regression model is used to express a variable $$Y$$ as a function of another variable $$X.$$ this implies that
A
There is a causal relationship between $$Y$$ and $$X$$
B
A value of $$X$$ may be used to estimate a value of $$Y$$
C
Values of $$X$$ exactly determine values of $$Y$$
D
There is no causal relationship between $$Y$$ and $$X$$
2
GATE ME 2001
MCQ (Single Correct Answer)
+1
-0.3
When using a simple moving average to forecast demand, one would
A
give equal weight to all demand data
B
assign more weight to the recent demand data
C
include new demand data in the average without discarding the earlier data
D
include new demand data in the average after discarding some of the earlier demand data
3
GATE ME 1998
MCQ (Single Correct Answer)
+1
-0.3
Which one of the following forecasting techniques is not suited for making forecasts for planning production schedules in the short range?
A
Moving average
B
Exponential moving average
C
Regression analysis
D
Delphi
4
GATE ME 1997
MCQ (Single Correct Answer)
+1
-0.3
The most commonly used criteria for measuring forecast error is
A
Mean absolute deviation
B
Mean absolute percentage error
C
Mean standard error
D
Mean square error
GATE ME Subjects
Engineering Mechanics
Machine Design
Strength of Materials
Heat Transfer
Production Engineering
Industrial Engineering
Turbo Machinery
Theory of Machines
Engineering Mathematics
Fluid Mechanics
Thermodynamics
General Aptitude