Geomatics Engineering Or Surveying
Traversing
Marks 1Marks 2
Theodolites and Plane Table Surveying
Marks 1
Measurement of Area, Volume and Theory of Errors and Survey Adjustment
Marks 1
Curves
Marks 1
Field Astronomy and Photogrammetric Surveying
Marks 1
Basics of GIS, GPS and Remote Sensing
Marks 1
Angular Measurements and Compass Survey
Marks 1Marks 2
Basic Concepts
Marks 1Marks 2
Linear Measurements and Chain Survey
Marks 1Marks 2
1
GATE CE 2007
MCQ (Single Correct Answer)
+2
-0.6
The plan of a map was photo copied to a reduced size such that a line originally 100mm, measures 90mm. The original scale of the plan was 1:1000. The revised scale is
A
1:900
B
1:11111
C
1:1121
D
1:1221
2
GATE CE 2007
MCQ (Single Correct Answer)
+2
-0.6
The plan of a survey plotted to a scale of 10m to 1cm is reduced in such a way that a line originally 10cm long now measures 9cm. the area of the reduced plan is measured as 81cm2. the actual (m2) of the survey is
A
10000
B
6561
C
1000
D
656
Questions Asked from Marks 2
GATE CE Subjects
Engineering Mechanics
Strength of Materials Or Solid Mechanics
Structural Analysis
Construction Material and Management
Reinforced Cement Concrete
Steel Structures
Geotechnical Engineering
Fluid Mechanics and Hydraulic Machines
Hydrology
Irrigation
Geomatics Engineering Or Surveying
Environmental Engineering
Transportation Engineering
Engineering Mathematics
General Aptitude