Operating Systems
Process Concepts and Cpu Scheduling
Marks 1Marks 2
Synchronization and Concurrency
Marks 1Marks 2
Memory Management
Marks 1Marks 2Marks 5
File System IO and Protection
Marks 1Marks 2Marks 5
1
GATE CSE 2015 Set 1
Numerical
+1
-0
The following two functions P1 and P2 that share a variable B with an initial value of 2 execute concurrently.
P1( ) {
  C = B – 1;
  B = 2 * C;
}


P2( ) {
  D = 2 * B;
  B = D - 1;
}
The number of distinct values that B can possibly take after the execution is___________.
Your input ____
2
GATE CSE 2013
MCQ (Single Correct Answer)
+1
-0.3
Three concurrent processes X, Y, and Z execute three different code segments that access and update certain shared variables. Process X executes the P operation (i.e., wait) on semaphores a, b and c; process Y executes the P operation on semaphores b, c and d; process Z executes the P operation on semaphores c, d, and a before entering the respective code segments. After completing the execution of its code segment, each process invokes the V operation (i.e., signal) on its three semaphores. All semaphores are binary semaphores initialized to one. Which one of the following represents a deadlock-free order of invoking the P operations by the processes?
A
X:P(a)P(b)P(c)
Y:P(b)P(c)P(d)
Z:P(c)P(d)P(a)
B
X:P(b)P(a)P(c)
Y:P(b)P(c)P(d)
Z:P(a)P(c)P(d)
C
X:P(b)P(a)P(c)
Y:P(c)P(b)P(d)
Z:P(a)P(c)P(d)
D
X:P(a)P(b)P(c)
Y:P(c)P(b)P(d)
Z:P(c)P(d)P(a)
3
GATE CSE 2010
MCQ (Single Correct Answer)
+1
-0.3
Consider the methods used by processes P1 and P2 for accessing their critical sections whenever needed, as given below. The initial values of shared boolean variables S1 and S2 are randomly assigned.

GATE CSE 2010 Operating Systems - Synchronization and Concurrency Question 31 English
Which of the following statement describes the properties achieved?
A
Mutual exclusion but not progress
B
Progress but not mutual exclusion
C
Neither mutual exclusion nor progress
D
Both mutual exclusion and progress
4
GATE CSE 2002
MCQ (Single Correct Answer)
+1
-0.3
Which of the following scheduling algorithms is non-preemptive?
A
Round Robin
B
First-In-First-Out
C
Multilevel Queue Scheduling
D
Multilevel Queue Scheduling with feedback
GATE CSE Subjects
Theory of Computation
Operating Systems
Algorithms
Digital Logic
Database Management System
Data Structures
Computer Networks
Software Engineering
Compiler Design
Web Technologies
General Aptitude
Discrete Mathematics
Programming Languages
Computer Organization