1
GATE CE 2023 Set 2
MCQ (More than One Correct Answer)
+2
-0
The figure presents the time-space diagram for when the traffic on a highway is suddenly stopped for a certain time and then released. Which of the following statements are true?

2
GATE CE 2023 Set 1
MCQ (Single Correct Answer)
+2
-0.66
A plot of speed-density relationship (linear) of two roads (Road A and Road B) is shown in the figure.

If the capacity of Road A is CA and the capacity of Road B is CB, what is $\rm \frac{ C_A}{C_B }$?
3
GATE CE 2022 Set 2
Numerical
+2
-0
Assuming that traffic on a highway obeys the Greenshields model, the speed of a shockwave between two traffic streams (P) and (Q) as shown in the schematic is __________ kmph. (in integer)
Your input ____
Questions Asked from Marks 2
GATE CE Subjects
Engineering Mechanics
Strength of Materials Or Solid Mechanics
Structural Analysis
Construction Material and Management
Reinforced Cement Concrete
Steel Structures
Geotechnical Engineering
Fluid Mechanics and Hydraulic Machines
Hydrology
Irrigation
Geomatics Engineering Or Surveying
Environmental Engineering
Transportation Engineering
Engineering Mathematics
General Aptitude