Production Engineering
Metrology and Inspection
Marks 1Marks 2
Sheet Metal Forming Processes
Marks 1Marks 2
Welding Process
Marks 1Marks 2Marks 5
Advance Machine Tools
Marks 1Marks 2
1
GATE ME 2025
MCQ (Single Correct Answer)
+1
-0.33
Ceramics and glass are machined by
A
electric discharge machining
B
ultrasonic machining
C
electrochemical machining
D
transferred arc plasma machining
2
GATE ME 2024
MCQ (Single Correct Answer)
+1
-0.33

The preparatory functions in Computer Numerical Controlled (CNC) machine programming are denoted by the alphabet

A

G

B

M

C

P

D

O

3
GATE ME 2016 Set 3
MCQ (Single Correct Answer)
+1
-0.3
Match the following part programming codes with their respective functions GATE ME 2016 Set 3 Production Engineering - Advance Machine Tools Question 24 English
A
$$P - {\rm I}{\rm I},\,\,Q - {\rm I},\,\,R - {\rm I}V,\,\,S - {\rm I}{\rm I}{\rm I}$$
B
$$P - {\rm I}V,\,\,Q - {\rm I}{\rm I},\,\,R - {\rm I}{\rm I}{\rm I},\,\,S - {\rm I}$$
C
$$P - {\rm I}V,\,\,Q - {\rm I}{\rm I}{\rm I},\,\,R - {\rm I}{\rm I},\,\,S - {\rm I}$$
D
$$P - {\rm I}{\rm I}{\rm I},\,\,Q - {\rm I}V,\,\,R - {\rm I}{\rm I},\,\,S - {\rm I}$$
4
GATE ME 2015 Set 2
MCQ (Single Correct Answer)
+1
-0.3
A drill is positioned at point $$P$$ and it has to proceed to point $$Q.$$ The coordinates of point $$Q$$ in the incremental system of defining position of a point in $$CNC$$ part program will be GATE ME 2015 Set 2 Production Engineering - Advance Machine Tools Question 25 English
A
$$(3, 12)$$
B
$$(5, 7)$$
C
$$(7, 12)$$
D
$$(4, 7)$$
GATE ME Subjects
Engineering Mechanics
Machine Design
Strength of Materials
Heat Transfer
Production Engineering
Industrial Engineering
Turbo Machinery
Theory of Machines
Engineering Mathematics
Fluid Mechanics
Thermodynamics
General Aptitude