1
In a project, tasks $$A, B, C, D, E, F, G, H, I$$ and $$J$$ are to be performed. The precedence relationships and the time required (in days) to complete the tasks are given in the Table. GATE PI 2017 Industrial Engineering - Pert and Cpm Question 1 English

The time required (in days) to complete the project along the critical path is ______________

GATE PI 2017
2
Consider a network with nodes $$1, 2, 3, 4, 5$$ and $$6.$$ The nodes are connected with directed arcs as shown in the table below. The respective costs (in $$INR$$) incurred while traversing the directed arcs are also mentioned. GATE PI 2016 Industrial Engineering - Pert and Cpm Question 2 English

The second shortest path from node $$1$$ to node $$6$$ (i.e. the path that has the second least total cost and does not use any part of the shortest path) has a total cost (in $$INR$$) of

GATE PI 2016