Environmental Engineering
Sources and Coveyances Water
Marks 1Marks 2
Quality Control of Water
Marks 1Marks 2
Treatment of Water
Marks 1Marks 2
Water Demand
Marks 1Marks 2
Waste Water Characteristics
Marks 1Marks 2
Sewage System and Sewer Appurtenances
Marks 1
Treatment of Sewage
Marks 2
Disposal of Sewage Effluent
Marks 1Marks 2
Solid Waste Management
Marks 1Marks 2
Air Pollution
Marks 1Marks 2
Noise Pollution
Marks 1
1
GATE CE 2004
MCQ (Single Correct Answer)
+2
-0.6
The present population of a community is 28000 with an average water consumption of 4200 $$m^3/d$$. The existing water treatment plant has a design capacity of 6000 $$m^3/d$$. It is expected that the population will increase to 44000 during the next 20 years. The number of years from now when the plant will reach it's design capacity, assuming an arithmetic rate of population growth, will be
A
5.5 years
B
8.6 years
C
15.0 years
D
16.5 years
Questions Asked from Marks 2
GATE CE Subjects
Engineering Mechanics
Strength of Materials Or Solid Mechanics
Structural Analysis
Construction Material and Management
Reinforced Cement Concrete
Steel Structures
Geotechnical Engineering
Fluid Mechanics and Hydraulic Machines
Hydrology
Irrigation
Geomatics Engineering Or Surveying
Environmental Engineering
Transportation Engineering
Engineering Mathematics
General Aptitude